Your cart is currently empty!
SayPro Post-Installation Inspection Form

SayPro Monthly January SCMR-13 SayPro Monthly Installation: Ensure professional installation for effectiveness by SayPro Brand Material Office under SayPro Marketing Royalty SCMR
SayPro Post-Installation Inspection Form
Document Code: SCMR-13-PIIF
Version: 1.0
Effective Date: January 2025
Issued by: SayPro Brand Material Office
Under: SayPro Marketing Royalty SCMR
SECTION A: General Information
Field | Input |
---|---|
Project Name | |
Installation Address | |
Installation Date | |
Installation Team Lead | |
SayPro Supervisor Name | |
Inspector Name | |
Date of Inspection |
SECTION B: Branding and Design Compliance Checklist
Item | Pass / Fail | Comments |
---|---|---|
Official SayPro branding materials used | ☐ Pass ☐ Fail | (e.g., signage, displays, decals) |
Placement matches approved layout | ☐ Pass ☐ Fail | (reference design blueprint or plan) |
Logo positioning and sizing correct | ☐ Pass ☐ Fail | (refer to brand manual) |
Fonts and colors follow brand guidelines | ☐ Pass ☐ Fail | (compare to SayPro brand standards) |
No unauthorized modifications made | ☐ Pass ☐ Fail | (materials, content, spacing) |
Materials used are in pristine condition | ☐ Pass ☐ Fail | (no peeling, chipping, fading) |
Digital screens (if applicable) function correctly | ☐ Pass ☐ Fail | (test loops, content, resolution) |
Promotional materials correctly placed | ☐ Pass ☐ Fail | (posters, brochures, QR codes) |
SECTION C: Installation Quality Standards
Item | Pass / Fail | Comments |
---|---|---|
All items securely and professionally installed | ☐ Pass ☐ Fail | (anchored, mounted, or suspended correctly) |
Wiring neat, concealed where applicable | ☐ Pass ☐ Fail | (especially for lighting or digital components) |
Surfaces properly cleaned post-installation | ☐ Pass ☐ Fail | (no dust, fingerprints, adhesives left behind) |
No hazards introduced (e.g., tripping, sharp edges) | ☐ Pass ☐ Fail | (inspect for risk and safety compliance) |
Lighting works as intended | ☐ Pass ☐ Fail | (correct intensity, no flickering) |
Electrical components tested and safe | ☐ Pass ☐ Fail | (certified and documented) |
Installation aligns with structural integrity | ☐ Pass ☐ Fail | (no damage to wall, ceiling, floor) |
SECTION D: Safety & Compliance
Item | Pass / Fail | Comments |
---|---|---|
Installation complies with local safety codes | ☐ Pass ☐ Fail | (fire, electrical, and building regulations) |
Fire exits, signage, and alarms not obstructed | ☐ Pass ☐ Fail | (visibility and access confirmed) |
Emergency access maintained | ☐ Pass ☐ Fail | (no obstruction due to installation) |
PPE used during installation | ☐ Pass ☐ Fail | (documented with team photos, checklists) |
Final area left clean and clear | ☐ Pass ☐ Fail | (ready for client/public use) |
SECTION E: Photo Documentation
Please attach photos of:
- Before installation
- During installation (showing work in progress and safety compliance)
- Final installation (wide and close-up shots)
- Signage details and any digital displays
☐ Photos attached
☐ File names documented
SECTION F: Final Comments & Recommendations
- Overall Evaluation:
☐ Approved
☐ Approved with Conditions
☐ Not Approved - Inspector’s Summary:
Include any notes, discrepancies, or suggestions for improvement.
SECTION G: Sign-Off
Role | Name | Signature | Date |
---|---|---|---|
Installation Lead | |||
SayPro Supervisor | |||
Inspector |
Note: This form must be submitted within 24 hours of installation completion to the SayPro Brand Material Office via the SayPro Quality Assurance Portal under SCMR.
Leave a Reply
You must be logged in to post a comment.