SayPro Staff

SayProApp Machines Services Jobs Courses Sponsor Donate Study Fundraise Training NPO Development Events Classified Forum Staff Shop Arts Biodiversity Sports Agri Tech Support Logistics Travel Government Classified Charity Corporate Investor School Accountants Career Health TV Client World Southern Africa Market Professionals Online Farm Academy Consulting Cooperative Group Holding Hosting MBA Network Construction Rehab Clinic Hospital Partner Community Security Research Pharmacy College University HighSchool PrimarySchool PreSchool Library STEM Laboratory Incubation NPOAfrica Crowdfunding Tourism Chemistry Investigations Cleaning Catering Knowledge Accommodation Geography Internships Camps BusinessSchool

SayPro Post-Installation Inspection Checklist

SayPro is a Global Solutions Provider working with Individuals, Governments, Corporate Businesses, Municipalities, International Institutions. SayPro works across various Industries, Sectors providing wide range of solutions.

Email: info@saypro.online Call/WhatsApp: + 27 84 313 7407

SayPro Monthly January SCMR-13 SayPro Monthly Installation: Ensure professional installation for effectiveness by SayPro Brand Material Office under SayPro Marketing Royalty SCMR

SayPro Post-Installation Inspection Checklist Template

Document Title:
SayPro Post-Installation Inspection Checklist
Reference: SayPro Monthly January SCMR-13
Department: SayPro Brand Material Office
Supervising Body: SayPro Marketing Royalty SCMR
Version: 1.0
Effective Date: January 2025


✅ SECTION 1: GENERAL INSTALLATION DETAILS

FieldDetails
Project Name_______________________________
Installation Date____ / ____ / ______
Installation Location_______________________________
Installer/Contractor Name_______________________________
SayPro Project Manager_______________________________
Material Used (Type/Batch No.)_______________________________
Inspection Date____ / ____ / ______

🛠️ SECTION 2: PHYSICAL INSTALLATION CHECK

CheckpointDescriptionStatus (✔/✘)Comments
Material PlacementAll materials are positioned as per approved layout
Securing of MaterialsAll fixtures/fittings are secured properly (no loose ends)
Surface AlignmentItems are aligned symmetrically and leveled
Branding VisibilitySayPro logos and branding are visible, not obstructed
Structural IntegritySupports, frames, and bases are stable and solid
Cabling & WiringWires are hidden or managed neatly
Safety ComplianceNo sharp edges, exposed bolts, or trip hazards
Lighting & ElectricalAll lighting/electrical installations are functional and safe
Signage InstallationSignboards are mounted at correct height & angle
Adhesives/SealantsNo spillage, residue, or uneven applications visible

🔍 SECTION 3: QUALITY COMPLIANCE

CheckpointRequirementStatus (✔/✘)Remarks
Material VerificationInstalled material matches SayPro approved batch/type
Finish QualitySurfaces are clean, polished, and defect-free
Color MatchingColor schemes match SayPro brand standards (Pantone code verified)
Branding ElementsConsistent with approved mock-ups and visual guidelines
Functional TestingAll mechanical/electrical features are tested and passed
Final Look & FeelInstallation presents a premium, professional appearance

🧾 SECTION 4: DOCUMENTATION

Document TypeAttached (✔/✘)Notes
Delivery Receipts
Material Safety Data Sheets
Installation Diagrams
Product Warranty Cards
Approval Photos (Before/After)
Installer Certification

📌 SECTION 5: SIGN-OFF

RoleNameSignatureDate
Installer
SayPro Quality Inspector
SayPro Brand Officer
Client/Stakeholder (Optional)

📝 NOTES & OBSERVATIONS

(Write any relevant observations, pending tasks, or corrective actions required.)





📎 INSTRUCTIONS

  • Complete the checklist on-site immediately after installation.
  • Mark each item with ✔ (Compliant) or ✘ (Non-Compliant).
  • For ✘ items, include detailed comments or photos and raise a non-compliance report.
  • Submit completed form to SayPro Brand Material Office within 24 hours of inspection.
  • Archive checklist as part of monthly compliance records under SCMR documentation.

Comments

Leave a Reply

Index