SayPro Monthly January SCMR-13 SayPro Monthly Installation: Ensure professional installation for effectiveness by SayPro Brand Material Office under SayPro Marketing Royalty SCMR
SayPro Table of Contents
Toggle
SayPro Post-Installation Inspection Checklist Template
Document Title: SayPro Post-Installation Inspection Checklist Reference: SayPro Monthly January SCMR-13Department: SayPro Brand Material OfficeSupervising Body: SayPro Marketing Royalty SCMRVersion: 1.0Effective Date: January 2025
✅ SECTION 1: GENERAL INSTALLATION DETAILS
Field Details Project Name _______________________________ Installation Date ____ / ____ / ______ Installation Location _______________________________ Installer/Contractor Name _______________________________ SayPro Project Manager _______________________________ Material Used (Type/Batch No.) _______________________________ Inspection Date ____ / ____ / ______
🛠️ SECTION 2: PHYSICAL INSTALLATION CHECK
Checkpoint Description Status (✔/✘) Comments Material Placement All materials are positioned as per approved layout Securing of Materials All fixtures/fittings are secured properly (no loose ends) Surface Alignment Items are aligned symmetrically and leveled Branding Visibility SayPro logos and branding are visible, not obstructed Structural Integrity Supports, frames, and bases are stable and solid Cabling & Wiring Wires are hidden or managed neatly Safety Compliance No sharp edges, exposed bolts, or trip hazards Lighting & Electrical All lighting/electrical installations are functional and safe Signage Installation Signboards are mounted at correct height & angle Adhesives/Sealants No spillage, residue, or uneven applications visible
🔍 SECTION 3: QUALITY COMPLIANCE
Checkpoint Requirement Status (✔/✘) Remarks Material Verification Installed material matches SayPro approved batch/type Finish Quality Surfaces are clean, polished, and defect-free Color Matching Color schemes match SayPro brand standards (Pantone code verified) Branding Elements Consistent with approved mock-ups and visual guidelines Functional Testing All mechanical/electrical features are tested and passed Final Look & Feel Installation presents a premium, professional appearance
🧾 SECTION 4: DOCUMENTATION
Document Type Attached (✔/✘) Notes Delivery Receipts Material Safety Data Sheets Installation Diagrams Product Warranty Cards Approval Photos (Before/After) Installer Certification
📌 SECTION 5: SIGN-OFF
Role Name Signature Date Installer SayPro Quality Inspector SayPro Brand Officer Client/Stakeholder (Optional)
📝 NOTES & OBSERVATIONS
(Write any relevant observations, pending tasks, or corrective actions required.)
📎 INSTRUCTIONS
Complete the checklist on-site immediately after installation.
Mark each item with ✔ (Compliant) or ✘ (Non-Compliant).
For ✘ items, include detailed comments or photos and raise a non-compliance report.
Submit completed form to SayPro Brand Material Office within 24 hours of inspection.
Archive checklist as part of monthly compliance records under SCMR documentation.
Leave a Reply
You must be logged in to post a comment.