SayProApp Courses Partner Invest Corporate Charity Divisions

SayPro Email: info@saypro.online Call/WhatsApp: + 27 84 313 7407

SayPro Post-Installation Inspection Form

SayPro Monthly January SCMR-13 SayPro Monthly Installation: Ensure professional installation for effectiveness by SayPro Brand Material Office under SayPro Marketing Royalty SCMR

SayPro Post-Installation Inspection Form

Document Code: SCMR-13-PIIF
Version: 1.0
Effective Date: January 2025
Issued by: SayPro Brand Material Office
Under: SayPro Marketing Royalty SCMR


SECTION A: General Information

FieldInput
Project Name
Installation Address
Installation Date
Installation Team Lead
SayPro Supervisor Name
Inspector Name
Date of Inspection

SECTION B: Branding and Design Compliance Checklist

ItemPass / FailComments
Official SayPro branding materials used☐ Pass ☐ Fail(e.g., signage, displays, decals)
Placement matches approved layout☐ Pass ☐ Fail(reference design blueprint or plan)
Logo positioning and sizing correct☐ Pass ☐ Fail(refer to brand manual)
Fonts and colors follow brand guidelines☐ Pass ☐ Fail(compare to SayPro brand standards)
No unauthorized modifications made☐ Pass ☐ Fail(materials, content, spacing)
Materials used are in pristine condition☐ Pass ☐ Fail(no peeling, chipping, fading)
Digital screens (if applicable) function correctly☐ Pass ☐ Fail(test loops, content, resolution)
Promotional materials correctly placed☐ Pass ☐ Fail(posters, brochures, QR codes)

SECTION C: Installation Quality Standards

ItemPass / FailComments
All items securely and professionally installed☐ Pass ☐ Fail(anchored, mounted, or suspended correctly)
Wiring neat, concealed where applicable☐ Pass ☐ Fail(especially for lighting or digital components)
Surfaces properly cleaned post-installation☐ Pass ☐ Fail(no dust, fingerprints, adhesives left behind)
No hazards introduced (e.g., tripping, sharp edges)☐ Pass ☐ Fail(inspect for risk and safety compliance)
Lighting works as intended☐ Pass ☐ Fail(correct intensity, no flickering)
Electrical components tested and safe☐ Pass ☐ Fail(certified and documented)
Installation aligns with structural integrity☐ Pass ☐ Fail(no damage to wall, ceiling, floor)

SECTION D: Safety & Compliance

ItemPass / FailComments
Installation complies with local safety codes☐ Pass ☐ Fail(fire, electrical, and building regulations)
Fire exits, signage, and alarms not obstructed☐ Pass ☐ Fail(visibility and access confirmed)
Emergency access maintained☐ Pass ☐ Fail(no obstruction due to installation)
PPE used during installation☐ Pass ☐ Fail(documented with team photos, checklists)
Final area left clean and clear☐ Pass ☐ Fail(ready for client/public use)

SECTION E: Photo Documentation

Please attach photos of:

  • Before installation
  • During installation (showing work in progress and safety compliance)
  • Final installation (wide and close-up shots)
  • Signage details and any digital displays

☐ Photos attached
☐ File names documented


SECTION F: Final Comments & Recommendations

  • Overall Evaluation:
    ☐ Approved
    ☐ Approved with Conditions
    ☐ Not Approved
  • Inspector’s Summary:
    Include any notes, discrepancies, or suggestions for improvement.

SECTION G: Sign-Off

RoleNameSignatureDate
Installation Lead
SayPro Supervisor
Inspector

Note: This form must be submitted within 24 hours of installation completion to the SayPro Brand Material Office via the SayPro Quality Assurance Portal under SCMR.

Comments

Leave a Reply

Index